Mechanical Engineering Objective Questions { Industrial Engineering }



29. Work sampling observations are taken on the basis of
A.Detailed calculations
B.Convenience
C.Table of random numbers
D.Past experience

30. One time measurement unit (TMU) in method time measurement system equals
A.0.0001 minute
B.0.0006 minute
C.0.006 minute
D.0.001 minute

31. Basic motion time study gives times for basic motions in ten thousandths of
A.Second
B.Minute
C.Hour
D.Day

32. Choose the wrong statement. Motion study is used for
A.Improving a work method
B.Reducing inventory costs.
C.Designing a work method
D.Providing a schematic framework

33. Gnatt chart provides information about the
A.Material handling
B.Proper utilisation of manpower
C.Production schedule
D.Efficient working of machine

34. ABC analysis deals with
A.Analysis of process chart
B.Flow of material
C.Oraering schedule of job
D.Controlling inventory costs money

35. Process layout is employed for
A.Batch production
B.Continuous type of product
C.Effeclive utilisation of machines
D.All of the above