106. CPM is the
A.Time oriented technique
B.Event oriented technique
C.Activity oriented technique
D.Target oriented technique
107. PMTP (predetermined motion time systems) include
A.MTM (method time measurement)
B.WFS (work factor systems)
C.BNTS (basic motion time study)
D.All of the above
108. Work study comprises following main techniques
A.Method study and work measurement
B.Method study and time study
C.Tithe study and work measurement
D.Method study and job evaluation
109. PERT is the
A.Time oriented technique
B.Event oriented techniqne
C.Activity oriented technique
D.Target oriented technique
110. The basic difference between PERT and CPzM is that
A.PERT deals with events and CPM , with activities
B.Critical path is determined in PERT only
C.Costs are considered on CPM only and not in PERT
D.Ghewed times are used in PERT and evaluateil times in CPM
111. PERT stands for
A.44 project evaluation and review technique
B.Project examination and review technique
C.Project evaluation and reporting technique
D.Process execution and reporting technology
112. Queing theory is used for
A.Inventory problems
B.Traffic congestion studies
C.Job-shop scheduling
D.All of the above