134. The ratio of maximum load to rated plant capacity is known as
A.Load factor
B.Utilization factor
C.Maximum load factor
D.Capacity factor
135. Portion of the installed reserve kept in operable condition but not placed in service to supply the peak load is known as
A.Operating reserve
B.Spinning reserve
C.Cold reserve
D.Hot reserve
136. Capacity of a hydroelectric plant in service in excess of the peak load is known as
A.Operating reserve
B.Spinning reserve
C.Cold reserve
D.Hot reserve
Page 20 of 20