A Best Way To Crack Gorenment Job Exams

Indian Railway MCQs

General Knowledge Objective Questions



519. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
Discussion

520. The maximum distance covered by a patrol man should not normally exceed
Discussion

521. When a train is received at a station during signal failure on signal post telephone, the speed of train is
Discussion

522. What is the position of the Indian Railway under the zonal system?
Discussion

523. High flood level mark shall be painted in
Discussion

524. Booked speed is determined by ________.
Discussion

525. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
Discussion

Page 75 of 124

« 73 74  75  7677 »