Civil Engineering Objective Questions { Water Resources Engineering }



57. The rainfall cycle period in India is taken as
Discussion

58.  Pick up the correct statement from the following : actual rainfall in a year at a place
Discussion

59.  Isohytes are the imaginary lines joining the points of equal
Discussion

60. The area enclosed by the adjacent isohyets of a catchment basin are shown under : Isohyets in ctns I 40-50 I 50-60 160-70 70-80 I 80-90 Area in sq. km I 1500 , 2500 I 3000 2000 1000 The average depth of annual precipitation in the catchment basin will be
Discussion

61.  For determination of average annual precipitation in a catchment basin, the best method is
Discussion

62. While calculating the average depth of annual precipitation in a catchment basin, importance to individual raingauge station is given in
Discussion

63.  The rainfall at any place is described by
Discussion