Civil Engineering Objective Questions { Railways }



176. Which of the following pairs is correctly matched: 1. Pole sleepers 2. Slab sleepers 3. Quarter sleepers 1. Sleepers may be obtained from tree trunk 2. Sleepers may be obtained from tree trunk 3. Sleepers may be obtained from trete trunk Select the correct answer using the codes given below : Codes:
A. 1, 2, 3
B. 1, 3
C. 2, 3
D. 1, 2
Discuss in Forum

177. Which of the following pairs is correctly matched ? 1. Ballast cushion 2. Crib ballast 3. Shoulder ballast 4. Shoulder width The depth of ballast under the rails The ballast between the sleepers The ballast provided beyond the sleeper edge The projected length of the ballast top beyond the sleeper edge. Select the correct answer using the codes given below :Codes :
A. 1, 3, 2, 4 correct
B. 2, 3, 4 correct
C. 1, 2, 3 correct
D. 1, 4 correct.
Discuss in Forum

178. Which of the following pairs is correctly matched ? 1. Fish bolts used for fixing fish plates with rails in joints 2. Fang bolts used for fixing chairs with sleepers 3. Hook bolts used for fixing sleepers with bridge girders Select the correct answer by using the following codes : Codes:
A. 1, 2, 3 correct
B. 1, 3 correct
C. 2, 3 correct
D. 1, 2 correct.
Discuss in Forum

179.  Which of the following pairs is correctly matched ? 1. Grade compensation on B .G. track 0.04% per degree 2. Grade compensation on M.G. track 0.03% per degree 3. Grade compensation on N.G. track 0.01 % per degree Select the correct answer using the codes given below : Codes:
A. 1, 2 and 3
B. 1 and 2
C. 2 and 3
D. 1 and 3
Discuss in Forum

180.  Which of the following pairs for superelevation as per Indian Railways specification is correctly matched? 1. B.C. Track-165mm 2. M.G. track-102mm 3. N.G. track-76 mm Select the correct answer using the codes given below : Codes:
A. 3 alone
B. 2 and 3
C. land 3
D. 1, 2 and 3
Discuss in Forum

181.  Consider the following statements : 1. The shortage of the actual superelevation for higlrbed trains, is called cant deficiency. 2. The excess of the superelevation for low speed trains is called cant excess. 3. The rate of increase or decrease of superelevation along a transition curve is called cant gradient 4. Negative superelevation occurs when a branch line diverges the main track. Of these statements:
A. 1, 2 and 3 are correct.
B. 2, 3 and 4 are correct.
C. 1, 2 and 4 are correct.
D. 1, 2, 3 and 4 are correct.
Discuss in Forum

182.  Which is the correct definition regardings points and crossing. 1. The rail of the V-s.haped portion of the crossing joined a little behind of nose of crossing is called splice rail. 2. The bent up rail of the crossing which is connected to the end of the crossing lead rail, is called wing rail 3. The rail of V-shaped portion of the crossing which extends upto nose of crossing is called point rail 4. The rail of the main line track against which tongue rail snugly fits is called stock rail Select the correct answer using the codes given below : Codes:
A. 1, 2, 3, 4
B. 2, 3, 4
C. 3, 1, 2
D. 1, 3, 4
Discuss in Forum