169. Post tensioning system
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
170. The system in which high tensile alloy steel bars (silica manganese steel) are used as prestressing tendons, is known as
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
171. If k is wobble correction factor, g is coefficient of friction between the duct surface and the curve of tendon of radius R, the tension ratio at a distance x from either end, is
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
172. After prestressing process is completed, a loss of stress is due to
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
173. If C is creep coefficient, f is original prestress in concrete, m is modular ratio, E is Young's modulus of steel and e is shrinkage strain, the combined effect of creep and shrinkage is :
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
174. A per IS : 1343, total shrinkage for a pretensioned beam, is
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.
175. The reinforced concrete beam which has width 25 cm lever arm 40 cm, shear force 6t/cm2, safe shear stress 5 kg/cm and B.M. 24 mt,
Solution: Not available. Please sign up to discuss it in grabSTUDY forum.