A Best Way To Crack Gorenment Job Exams

Civil Engineering Objective Questions { Pert and Cpm }



36. Pick up the correct statement from the following :
A. Programme Evaluation and Review Technique, is event oriented
B. Programme Evaluation and Review Technique is not event oriented
C. Critical Path Method is event oriented
D. Ci-itical Path method is event oriented.

37. PERT analysis is based on
A. optimistic time
B. pessimistic time
C. most likely time
D. all the above.

38. Critical path method
A. is an improvement upon bar chart method
B. provides a realistic approach to daily problems
C. avoids delays which are very common in bar charts
D. All the above.

39. While scheduling a project by C.P.M.
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. All the above.

40. The performance of a specific task in CPM, is known
A. Dummy
B. Event
C. Activity
D. Contract.

41. Completion of an activity on CPM network diagram, is generally known
A. Event
B. Node
C. Connector
D. All the above.

42. An event is indicated on the network by a number enclosed in
A. a circle
B. a square
C. a triangle
D. all the above.