1. Works costing less than Rs 20,000 are treated as
A. projects
B. major projects
C. minor projects
D. all the above.
2. The cost ef a project is more than
A. one lac
B. two lacs
C. three lacs
D. four lacs
3. Railway projects are treated as
A. light construction
B. heavy construction
C. industrial construction
D. none of these.
4. Residential buildings are treated as
A. light construction
B. heavy construction
C. industrial construction
D. private construction.
5. Power stations are generally treated as
A. light construction
B. heavy construction
C. industrial construction
D. electrical construction.
6. The first stage of a construction, is
A. preparation of estimate
B. survey of the site
C. initiation of proposal
D. preparation of tender
7. Pre-tender stage requires
A. acquisition of land
B. selection of site
C. finalisation of alignment of work
D. all the above.