A Best Way To Crack Gorenment Job Exams

Civil Engineering Objective Questions { Estimating And Costing }



57.  The slope of the oultet of 'P trap' below the horizontal is kept
A. 8?
B. 10?
C. 12?
D. 14?.
Discuss in Forum

58. Anti-siphonage pipe is connected to
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet.
Discuss in Forum

59.  The value of 'C' of Indian type W.C. shown in Fig. 23.3 is
A. 400 mm
B. 450 mm
C. 500 mm
D. 550 mm.
Discuss in Forum

60. The value of 'A' of Indian type W.C. shown in Fig. 23.3 is :
A. 25 cm
B. 30 cm
C. 40 cm
D.( d) 45 cm.
Discuss in Forum

61. The value of`B' of Indian type W.C. shown in Fig. 23.3 is :
A. 45 cm
B. 50 cm
C. 30 cm
D. 25 cm.
Discuss in Forum

62. The height of the sink of wash basin above floor level is kept
A. 60 cm
B. 70 cm
C. 75 cm to 80 cm
D. 80 cm.
Discuss in Forum

63.  The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
A. 100 mm
B. 150 mm
C. 200 mm
D. 175 mm.
Discuss in Forum

Page 9 of 14