8. The plinth area of a building includes
A. area of the walls at the floor level
B. area of stair cover
C. internal shaft for sanitary installations up to 2 sq m. in area
D. area of cantilevered porch.
Discuss in Forum

9. Carpet area does not include the area of
A. the walls along with doors and other openings
B. verandah, corridor and passage
C. bath room and lavatory
D. All the above.
Discuss in Forum

10. The floor area includes the area of the balcony up to
A.100%
B.75%
C.50%
D. 25%.
Discuss in Forum

11.  Pick up the correct statement from the following :
A. The estimated value of the work excluding the amount for contigencies, work charged establishment, tool and plants, is called work value
B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost
C. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval
D. All the above.
Discuss in Forum

12. While estimating the qualities for the construction of a building, the correct metric unit is
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Litre for capacity
Discuss in Forum

13. Accorcling-Indian Standards Institute, the actual -Size of modulni-bricks is
A. 23 cm x 11.5 cm x 7.5 cm
B. 25 cm x 13 cm x 7.5 cm
C. 19 cm x 9 cm x 9 cm
D. 20 cm x 10 cm x 10 cm.
Discuss in Forum

14.  The order of booking dimensions is
A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these.
Discuss in Forum