Login
Signup
Engineering
MECHANICAL ENGINEERING
ELECTRICAL ENGINEERING
ELECTRONICS ENGINEERING
CIVIL ENGINEERING
CHEMICAL ENGINEERING
AUTOMOBILE ENGINEERING
Aptitude
QUANTITATIVE APTITUDE
VERBAL ABILITY
GS
GENERAL KNOWLEDGE
CURRENT AFFAIRS
More
COURSE ON COMPUTER CONCEPTS
MICROBIOLOGY
BIOCHEMICAL ENGINEERING
BIOTECHNOLOGY
BIOCHEMISTRY
TECHNICAL MCQs
STATE GOVERNMENT EXAMS
Civil Engineering Objective Questions
{ Estimating And Costing }
Home
//
Civil Engineering
// Estimating And Costing
92. The item of steel work which is measured in sq. m, is
A. Collapsible gates
B. Rolling shutters
C. Steel doors
D. All the above.
View Answer
Discuss in Forum
93. Pick up the correct statement from the following :
A. Pointing is measured in sq. m
B. Plastering is measured in sq. m
C. Glazing is measured in sq. m
D. All the above.
View Answer
Discuss in Forum
94. For 12 mm thick cement plastering 1 : 6 on 100 sq. in new brick work, the quantity of cement required, is
A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3.
View Answer
Discuss in Forum
95. For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is
A. 0.90 rn3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3.