85. The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as
Discussion

86. Pick up the excavation where measurements are made in square metres for payment.
Discussion

87. The concrete work for the following part of the building of specified thickness is measured in square metres
Discussion

89. Brick walls are measured in sq. in if the thickness of the wall is
Discussion

90. The item of the brick structure measured in sq. m, is
Discussion

91. Pick up the item whose weight is added to the weight of respective item, is
Discussion