Civil Engineering Objective Questions { Environmental Engineering }



169. The digested sludge from septic tanks, is removed after a maximum period of
Discussion

170.  The rate of accumulation of sludge per person per year, is
Discussion

172.  The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope
Discussion

173.  Bottom openings 15 cm x 15 cm in the standing baffle wall are provided
Discussion

174. In a septic tank of de-sludging period of 1 year, receives sewage for 100 persons @ 120 litres per person per day. If the depth is kept 1.667 m and length-width ratio is 4, the length and width of the septic tank, are :
Discussion

175.  In case of Imhoff tanks,
Discussion