155.  The operation of removing humps and hollows of uniform concrete surface, is known as
A. floating
B. screeding
C. trowelling
D. finishing
Discuss in Forum

156.  The ratio of the length to breadth of a wooden float, is
A.45
B.55
C.65
D.75
Discuss in Forum

157.  Construction joints are provided
A. where BM and SF are small
B. where the member is supported by other member
C. at 18 m apart in huge structures
D. all the above
Discuss in Forum

158.  The surface where two successive placements of concrete meet, is known as
A. Contraction joint
B. Expansion joint
C. Construction joint
D. both A and B
Discuss in Forum

159.  A construction joint is provided where
A. bending moment is small
B. shear force is small
C. the member is supported by other member
D. all the above
Discuss in Forum

160.  Horizontal construction joints in concrete walls are generally provided at
A. soffit level
B. window sill level
C. floor level
D. all the above
Discuss in Forum

161.  Pick up the correct statement from the following :
A. Construction joints in columns are provided a few cm below the junction of beam
B. Construction joints in columns are provided at the bottom haunching
C. Construction joints in beams and slabs are provided within middel third
D. All the above
Discuss in Forum