155.  The operation of removing humps and hollows of uniform concrete surface, is known as
Discussion

156.  The ratio of the length to breadth of a wooden float, is
Discussion

157.  Construction joints are provided
Discussion

158.  The surface where two successive placements of concrete meet, is known as
Discussion

159.  A construction joint is provided where
Discussion

160.  Horizontal construction joints in concrete walls are generally provided at
Discussion