141.  Curing a concrete for long period ensures better
Discussion

142.  Under normal conditions using an ordinary cement, the period of removal of the form work, is :
Discussion

143.  While compacting the concrete by a mechanical vibrator, the slump should not exceed
Discussion

144.  The maximum thickness of concrete floor of a cement warehouse, is
Discussion

145.  The shuttering of a hall measuring 4 m x 5 m, can be removed after
Discussion

147.  If the effective working time is 7 hours and per batch time of concrete is 3 minutes, the output of a concrete mixer of 150 litre capacity, is